A data center solution architect is the design authority for the whole facility. That means power, cooling, compute, network, security, operations and the energy strategy, designed as one system, with the specialist firms who build each part selected and directed. AJ Projects Partners fills that role on legacy retrofits and new sustainable builds, and brings a network of 165 partners and businesses to execute.
Key takeaways
  • Projects rarely fail inside one discipline. They fail at the seams between power, cooling, compute and construction, where no single contractor is accountable.
  • We are the design authority, not the general contractor. We design the facility, then select, coordinate and hold to specification the partners who build it.
  • 165 partners and businesses cover construction, generation, cooling, electrical, network, cyber and NOC, compute, water, permitting and engineering.
  • Retrofit or new build, sustainability is designed in from the start: two-phase cooling with no evaporative water, on-site generation, and heat treated as an input.
  • We can supply the energy too, and it is optional. Our architecture works with other power, and our power works with other architects.
165
Partners and businesses in the execution network
One
Design authority accountable across every seam
Retrofit + New
Legacy facilities, industrial conversions and ground-up sustainable campuses
The Industry Problem

Why Do Data Center Projects Stall Between the Specialists?

A modern AI facility is five or six systems pulling on the same constraints, and each one is usually bought from a different firm.

The generation vendor sizes for its own equipment. The cooling vendor designs its loop. The general contractor builds to the drawings it was handed, and the compute tenant arrives with a rack density nobody planned for. Each firm can do its own scope well while the facility as a whole still fails, because the costly problems sit in the interfaces. Power a cooling system can't reject. Racks the floor can't carry. An interconnection request sized for hardware that will be two generations old by the time the power arrives.

It gets worse on retrofits. A legacy building brings fixed constraints (structure, electrical service, ceiling height, a cooling plant sized for 8 kW racks), and every specialist tends to design around the part they can see. Someone has to hold the whole design, own the tradeoffs and answer for whether what gets built matches what was designed. That is the role we fill.

What We Do

What Does AJ Projects Do as Your Solution Architect?

Austin Moore and Jackie Martinez lead every engagement as the architects of the whole data center. We design the facility and your partners build it, with us directing them.

Legacy Retrofits

We assess an existing facility against AI-era density, power and cooling requirements, then design a phased upgrade that keeps live operations running. Where the building can't get there, we model retrofit against rebuild and tell you which one it is.

Read the retrofit playbook →

Industrial Conversions

Warehouses, cross-docks and industrial sites often have what an AI facility needs most: land, structure and a path to power. We design the conversion, and where it makes sense we add self-powered pods beside the existing building.

See self-powered pods →

New Sustainable Builds

Ground-up campuses designed around compute density and a sustainable energy position from the first drawing. That means two-phase cooling, on-site generation and energy revenue in the base design, not added as options later.

The self-powered model →
The Partner Network

Who Builds It? A Network of 165 Partners and Businesses

We don't ask you to assemble and manage a dozen specialist contracts yourself. We match the partners to the design, bring them in and hold each one to the specification.

Partner CategoryWhat They Execute
Construction and general contractingSite work, shell and core, fit-out and pod installation, built to our specification
Power generationOn-site generation equipment, fuel systems, commissioning
Electrical and power distributionSwitchgear, distribution, fault-managed power delivery to the rack
CoolingLiquid and two-phase direct-to-chip systems, heat rejection
Network and connectivityFiber, carrier connections, cross-connects and fabric
Cyber and NOCPhysical and cyber security, network operations and monitoring
Compute hardwareGPU systems, racks, integration and burn-in
Water and environmentalWater recovery, environmental studies, noise and emissions work
Permitting and engineeringEngineers of record, permitting, utility and local-authority coordination

You keep the right to bring your own firms. We work with them the same way, and our specification applies to them the same way.

Energy, If You Want It

Can AJ Projects Supply the Power as Well?

Yes, and you don't have to take it. We develop our own on-site energy system. Fuel-flexible generators start on pipeline gas from day one, then run on hydrogen we make on site from aluminum, and their exhaust heat drives the reactor. For many sites it is the fastest way to reach power without waiting in an interconnection queue.

It is not exclusive to our architecture work. If your site already has a power strategy, we design around it. If you already have an architect and only need power, the energy system is available on its own.

A

Architecture and energy

One team designs the facility and supplies its power. It is the tightest integration and has the fewest interfaces.

B

Architecture only

We are your design authority and work with the grid, your existing generation or another energy provider.

C

Energy only

Self-powered pods integrated at your site, working with your architect, GC and tenants.

Your Data Center Has Many Contractors. It Needs One Architect.

Bring us the site, the building or the load you need. We'll show you what it can become, what it will take and who should build it.

Book a Discovery Call →

No pitch · No obligation · 30 minutes of actual strategy

Our Process

How Does an Engagement Run, From Site to Commissioning?

01

Objectives and constraints

Compute targets, workload mix, reliability requirements, energy cost and revenue objectives, timeline and capital. On a retrofit, this includes a baseline of what the building can and can't do today. You get: the design space, written down before any architecture decision is made.

02

Site analysis and energy assessment

Power availability and the interconnection position, the on-site generation option, land and structure, permitting, water, fiber and proximity to energy revenue. You get: a site verdict and an energy strategy, including whether to wait for the grid, generate on site, or do both.

03

Facility architecture and partner selection

Compute layout, power distribution, cooling, energy integration, network, security and operational systems. At the same time we match partners from the network to each scope. You get: specifications and documentation for procurement and construction, and a partner roster.

04

Energy and revenue modeling

Generation, fuel exposure, heat reuse, co-product revenue and net energy cost, run across operating scenarios. You get: the financial case an investment committee can underwrite, with the assumptions shown.

05

Construction advisory and systems integration

Submittal review, direction of partners against the specification, commissioning and performance validation through launch. You get: a facility that performs as designed, and one party accountable for whether it does.

Why Develop Through Us

Why Develop Your Data Center Through AJ Projects?

01

One accountable design authority. One party owns the interfaces between power, cooling, compute and construction, which is where projects lose time and money.

02

A network already assembled. 165 partners and businesses across every scope a facility needs, matched to your design rather than the other way around.

03

Sustainable by architecture. Two-phase cooling with no evaporative water, on-site generation and heat recovery are in the base design, not an ESG add-on.

04

Speed to power. A behind-the-meter path, including our own energy system, so the grid queue stops setting your schedule.

05

Revenue in the design. We model energy, heat and co-product revenue with the compute, so the facility is underwritten as an asset rather than a cost center.

06

We run what we sell. We are developing our own 73 MW self-generating campus in North Texas on the same architecture and energy system we design for you. It is in development, before construction.

Because we are an AI engineering firm and not only a facilities designer, we also build the software and automation that run inside the building. That covers operations dashboards, monitoring and the orchestration of generation, fuel, heat and load, with security designed in at the architecture stage. See AI data center architecture for the full capability list.

How We Compare

Solution Architect vs. General Contractor vs. Engineering Firm: What Is the Difference?

DimensionGeneral Contractor / Design-BuildEngineering Firm (MEP / AOR)Owner's RepresentativeAJ Projects (Solution Architect)
Primary jobBuild to the drawingsEngineer the disciplines they are hired forProtect the owner's budget and scheduleDesign the whole facility as one system and direct its build
Owns the interfacesWithin its contractWithin its disciplinesTracks themYes, across every discipline
Energy strategyOut of scopeDesigns to a given supplyOut of scopeDesigned in, with an optional on-site supply
Partner coordinationIts subcontractorsIts sub-consultantsMonitors othersSelects and directs a 165-partner network
Revenue modelingNoRarelyBudget onlyEnergy, heat and co-product revenue with the compute
Works alongside the othersYes. The roles complement each other.Yes. We direct the GC and engineers of record rather than replace them.
Common Questions

FAQs

Book a Discovery Call →

A data center solution architect is the design authority for the whole facility. They design power, cooling, compute, network, security, operations and the energy strategy as one system, then select, coordinate and hold to specification the specialist firms who build each part. The role exists because the costly failures in data center projects happen at the interfaces between disciplines, where no single contractor is accountable.

No. We are the design authority, not the general contractor or construction manager. We design the facility, bring in construction partners from our network or work with yours, review submittals against our specification, take part in commissioning and stay engaged until the facility performs as designed.

Both. On legacy facilities we assess the building against AI-era density, power and cooling requirements and design a phased upgrade that keeps live operations running. On industrial conversions we design the change of use, often with self-powered pods added beside the existing building. On new builds we design the campus from the ground up. Where a retrofit cannot reach the target, we model it against a rebuild and say so.

It is 165 partners and businesses that execute across construction and general contracting, power generation, electrical and power distribution, cooling, network and connectivity, cyber and NOC, compute hardware, water and environmental work, and permitting and engineering. We match partners to the design and direct them against the specification. Clients can also bring their own firms.

No. AJ Projects develops an on-site energy system in which fuel-flexible generators start on pipeline gas and then run on hydrogen made on site from aluminum. It is available but not exclusive to our architecture work. We design around the grid, your existing generation or another provider, and the energy system is also available on its own to projects with a different architect.

Measure the baseline first: power usage effectiveness, water use and where the heat goes. Then work through power headroom, cooling, distribution, on-site generation and heat reuse in that order. Moving high-density loads to two-phase direct-to-chip cooling takes evaporative cooling water out of that loop, and on-site generation changes both the carbon position and the dependence on the grid. We treat each sustainability measure as an economic decision as well, because most of them also cut operating cost.

Yes. We are developing our own 73 MW self-generating campus in North Texas on the same architecture and energy system we design for clients. It is in development, before construction.

Who We Work With

Who Develops a Data Center Through Us?

Anyone who holds a site, a building, a load requirement or capital, and wants a facility designed around compute density and a sustainable energy position.

Landowners and Developers Legacy Data Center Operators Industrial Property Owners Infrastructure Investors Enterprises Needing AI Capacity Colocation Providers Research and Healthcare Compute Economic Development Partners

Build the Data Center Once, as One System.

Retrofit, conversion or new campus: the first conversation covers your site, your load and your timeline, and whether we are the right architect for it.

Book a Discovery Call →

No pitch · No obligation · 30 minutes of actual strategy